
Aberdeen City Council
Everything Aberdeen City Council asks for when you apply for a short-term let licence, in plain English. Each item links to the council page it comes from.
Updated 18 November 2026Gathered from the council’s published information. Our team is still reviewing it.
What you need
7 documents for everyone
plus 2 depending on your situation, and 9 other steps.
See the documentsWhat it costs
New licence: £470.40 to £3,505.60
Paid to the council, not to us. Depends on your licence and guests.
See all feesSome documents depend on your property and situation. Our free check works out which apply to you.
Upload an EICR from a qualified electrical engineer for a test done within the last 5 years. It confirms the fixed electrical installation is safe.
Our guide: EICR for a short-term let in Scotland: electrical safety explained
Who provides it: Qualified electrical engineer (competent person)
How recent: issued within the last 60 months when you apply
Upload a PAT certificate covering plug-in appliances guests can use. It is renewed at least annually and each tested appliance needs a label.
Our guide: PAT testing for short-term lets in Scotland
Who provides it: Competent electrical contractor or trained PAT tester
Upload your EPC. Secondary letting properties must have one, with a copy kept in the property. Show the EPC rating on your listings.
Upload floor plans showing room sizes, fire escape routes and any accommodation for guests with mobility impairment. For secondary letting, plans should be to a suitable metric scale (preferably 1:50).
Our guide: Floor plans for a short-term let licence application in Scotland
Complete a legionella risk assessment and submit it with your application. You can do it yourself.
Our guide: Legionella risk assessment for a short-term let in Scotland
Complete the fire safety checklist and submit it with your application. It goes to the fire service, who decide whether to audit the property.
Our guide: Fire safety for short-term lets in Scotland: alarms, furniture and fire risk assessments
Give evidence of current buildings insurance covering short-term letting, and public liability insurance with at least £2m cover per dwelling.
Our guide: Insurance for short-term lets in Scotland: buildings and public liability
Only if the property has a gas supply.
If the property has a gas supply, upload a current annual gas safety certificate with your application. A Gas Safe registered engineer must check all gas pipes, flues and appliances every year.
Our guide: Gas safety certificate for a short-term let in Scotland
Who provides it: Gas Safe registered engineer
Only for new licence or renewal applications.
If the property has confirmed or suspected RAAC (a type of concrete), the owner must provide a structural engineer's report from a Chartered Structural Engineer (IStructE) or similar.
Who provides it: Chartered Structural Engineer (IStructE) or similarly qualified professional
Steps and declarations, grouped by when you’ll need to do them. Open each stage to see the list.
All applicants must contact Aberdeen's Planning service before applying. If planning permission is needed and not obtained, your application will be refused to be considered.
Common mistakes
Only if you don't own the property.
If you do not own the property, get a declaration of consent from each owner, or from a person authorised to act for them. All owners must be named on the form.
Pay the fee for your guest capacity and licence type (from £470.40 for 1-2 guests home sharing or letting, to £3,505.60 for 13+ secondary letting). It is the same for new and renewal. The application is not processed until it is paid.
Only for new licence or renewal applications.
Put up the public notice from your application confirmation email on or near the property, readable from the public footpath, for 21 days from the date you apply. Take a photo of it in place. Replace it if removed or defaced.
When: For 21 days from the date the application is lodged
Common mistakes
Only for new licence or renewal applications.
After the notice has been displayed for 21 days, complete the certificate of compliance online. Record any replacement of the notice on it.
Our guide: Short-term let site notice and certificate of compliance: how it works
When: After the notice has been displayed for 21 days
Only if the property has a private water supply.
If your property has a private water supply, you must follow the 2017 private supply regulations for owners.
Keep a folder for guests with the licence, safety information, emergency contacts, gas, EICR and PAT reports and EPC rating. Keep it up to date.
Every advert must show the licence number, maximum guests and EPC rating where required.
Only for renewal applications.
Licences last up to 3 years. Renewal is your responsibility, though the council may send a reminder.
You pay these to the council, not to us. Fees are as published by the council; check the source before you pay.
| Who it applies to | Fee | Source |
|---|---|---|
| Home sharing, Home letting, Home letting and sharing · 1 to 2 guestsNew application for a home sharing and/or home letting licence, 1 to 2 guests. Same fee as renewal. | £470.40 | aberdeencity.gov.uk (external site) |
| Secondary letting · 1 to 2 guestsNew secondary letting licence, 1 to 2 guests. | £492.80 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 3 to 4 guestsNew home sharing and/or home letting licence, 3 to 4 guests. | £705.60 | aberdeencity.gov.uk (external site) |
| Secondary letting · 3 to 4 guestsNew secondary letting licence, 3 to 4 guests. | £739.20 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 5 to 6 guestsNew home sharing and/or home letting licence, 5 to 6 guests. | £940.80 | aberdeencity.gov.uk (external site) |
| Secondary letting · 5 to 6 guestsNew secondary letting licence, 5 to 6 guests. | £985.60 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 7 to 8 guestsNew home sharing and/or home letting licence, 7 to 8 guests. | £1,254.40 | aberdeencity.gov.uk (external site) |
| Secondary letting · 7 to 8 guestsNew secondary letting licence, 7 to 8 guests. | £1,310.40 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 9 to 12 guestsNew home sharing and/or home letting licence, 9 to 12 guests. | £1,668.80 | aberdeencity.gov.uk (external site) |
| Secondary letting · 9 to 12 guestsNew secondary letting licence, 9 to 12 guests. | £1,752.80 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 13 or more guestsNew home sharing and/or home letting licence, 13 or more guests. | £3,337.60 | aberdeencity.gov.uk (external site) |
| Secondary letting · 13 or more guestsNew secondary letting licence, 13 or more guests. | £3,505.60 | aberdeencity.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| Home sharing, Home letting, Home letting and sharing · 1 to 2 guestsRenewal of a home sharing and/or home letting licence, 1 to 2 guests. | £470.40 | aberdeencity.gov.uk (external site) |
| Secondary letting · 1 to 2 guestsRenewal of a secondary letting licence, 1 to 2 guests. | £492.80 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 3 to 4 guestsRenewal of a home sharing and/or home letting licence, 3 to 4 guests. | £705.60 | aberdeencity.gov.uk (external site) |
| Secondary letting · 3 to 4 guestsRenewal of a secondary letting licence, 3 to 4 guests. | £739.20 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 5 to 6 guestsRenewal of a home sharing and/or home letting licence, 5 to 6 guests. | £940.80 | aberdeencity.gov.uk (external site) |
| Secondary letting · 5 to 6 guestsRenewal of a secondary letting licence, 5 to 6 guests. | £985.60 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 7 to 8 guestsRenewal of a home sharing and/or home letting licence, 7 to 8 guests. | £1,254.40 | aberdeencity.gov.uk (external site) |
| Secondary letting · 7 to 8 guestsRenewal of a secondary letting licence, 7 to 8 guests. | £1,310.40 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 9 to 12 guestsRenewal of a home sharing and/or home letting licence, 9 to 12 guests. | £1,668.80 | aberdeencity.gov.uk (external site) |
| Secondary letting · 9 to 12 guestsRenewal of a secondary letting licence, 9 to 12 guests. | £1,752.80 | aberdeencity.gov.uk (external site) |
| Home sharing, Home letting, Home letting and sharing · 13 or more guestsRenewal of a home sharing and/or home letting licence, 13 or more guests. | £3,337.60 | aberdeencity.gov.uk (external site) |
| Secondary letting · 13 or more guestsRenewal of a secondary letting licence, 13 or more guests. | £3,505.60 | aberdeencity.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| AllFee to vary an existing licence, for example changing named people, licence type or premises layout. | £74 | aberdeencity.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| AllFee to transfer a licence to a new host. Only the remaining term transfers, within the same category and occupancy. | £95.20 | aberdeencity.gov.uk (external site) |
Licence types covered: Secondary letting (a property that isn't your main home); Home letting (your own home while you're away); Home sharing (rooms in your home while you live there); Home letting and home sharing.
Aberdeen has not designated a short-term let control area and does not plan to at present. Planning permission may still be needed. The council's planning team decides case by case whether using a home as a short-term let is a material change of use. Check with Planning before you apply. If permission is needed and you don't have it, your application will be refused to be considered. You can re-apply without a further fee if you apply within 28 days of getting permission.
The council’s planning information (external site)Our guide to control areas
Renewing is the licence holder's responsibility. Apply through the same online form used for new applications. The council may send a reminder before expiry, but you should not rely on it. The council does not state a recommended lead time or say what happens if the licence expires first. Renewals need the same documents as new applications, and the fee is the same as for a first-time application.
Renewing in Aberdeen: fees, documents and how to apply
Free reminders
Tell us when your licence expires and we’ll email you 90 days, 30 days and 7 days before, so there’s time to renew. It’s free and there’s no password.
What the council says delays, returns or refuses applications.
Applying without the required documents makes the application incompetent (invalid).
Applying without needed planning permission means the application is refused to be considered.
Changing the day-to-day manager or agent after the licence is granted needs a new licence, not a transfer.
The application will not be processed until the right fee is paid.
On top of the national mandatory conditions, Aberdeen adds these.
Take reasonable steps to prevent and deal with nuisance from guests. Explain house rules, respond quickly to problems, and make sure guests park lawfully.
Give guests clear information and facilities for waste and recycling. Label bins as belonging to the property, and keep the bin area and outside tidy.
New hosts must not operate until a licence is granted. Operating without a licence is an offence.
Aberdeen will not grant temporary licences or temporary exemptions.
You must display a public notice at the property for 21 days, then complete a certificate of compliance online. Objections must arrive within 28 days.
Fees are non-refundable once the licence is granted or if refused. Refunds on withdrawal depend on how far the application got.
The council has 9 months to decide new and renewal applications. Licences last up to 3 years.
No control area is planned in Aberdeen, but planning permission may still be needed. Check with the Planning service before applying.
Where this comes from
We built this page from the published information below. If anything differs, the council’s own version is the one that counts.
Aberdeen short-term let licensing page(external site)Questions for the council: ShortTermLets@aberdeencity.gov.uk · 01224 067 575
Answer a few plain questions and we'll narrow this down to what applies to your property.