Dundee City Council
What Dundee City Council asks for when you renew, in plain English. Every point links to the council’s own pages. Information last checked 17 November 2026.
Licences last up to 3 years and usually expire on 1 February of the relevant year, unless a shorter licence was granted. The council sends a reminder before the renewal date. Renewal applications are accepted from 1 November, or up to 3 months before expiry. Use the same application form and tick the renewal box. Renewals need the current certificates plus the previous two years of insurance, PAT and gas certificates, and a site notice displayed for 21 days. The sources do not say what happens if the licence expires before you renew, so apply early and ask the council's STL team.
Information: Apply about 3 months before your licence expires
That’s Dundee’s own guidance, so there’s time for the council to decide before your licence runs out.
Warning: Don't let it lapse
Letting without a licence is a criminal offence. Put your licence expiry date somewhere you’ll see it, and check above what Dundee says happens if it runs out before you apply.
| For | Fee |
|---|---|
| 3-year licenceRenewal every 3 years costs the same as the initial application fee for your licence type and guest capacity (see the new application rows). | See details |
You pay this to Dundee, not to us.
Certificates you sent with your first application may have expired since. Dundee needs current ones with your renewal.
Only for new licence or renewal or change to a licence (variation) applications.
Complete the council's fire safety checklist and submit it with your application. Answer every question accurately, and don't submit until you understand all of them.
Our guide: Fire safety for short-term lets in Scotland: alarms, furniture and fire risk assessments
The council’s own form for this (external site)
Provide evidence of current buildings insurance that covers short-term let activity. For renewals, also provide the previous two years' certificates.
Our guide: Insurance for short-term lets in Scotland: buildings and public liability
Provide evidence of public liability insurance with minimum cover of £5m per dwelling. It must be Owner's/Public liability, not Employer's.
Our guide: Insurance for short-term lets in Scotland: buildings and public liability
Common mistakes
Upload a current EICR from an approved NICEIC or SELECT contractor. It should be renewed at least every 5 years.
Our guide: EICR for a short-term let in Scotland: electrical safety explained
Who provides it: NICEIC or SELECT approved contractor
Upload a current PAT certificate for plug-in appliances. Home sharing hosts need it only for the let rooms and communal areas. It must be renewed at least annually.
Our guide: PAT testing for short-term lets in Scotland
Who provides it: Approved electrical contractor or trained PAT tester
Upload your EPC where one is required. Keep a copy in the guest information folder and show the rating on listings.
Where planning permission is needed, get it before applying or show you have applied. Give the planning reference number if the property is in a control area or the council asks. Dundee has no control area at present.
Our guide: Planning permission and short-term let control areas in Scotland
Common mistakes
Only if the property has a gas supply.
If the property has gas, upload an annual gas safety certificate from a Gas Safe registered installer. Keep the current year's and previous two years' certificates for renewals.
Our guide: Gas safety certificate for a short-term let in Scotland
Who provides it: Gas Safe registered installer
Apply using the council's online system, upload all your documents and pay the fee at the end. Have all your documents ready before you start.
Only for new licence or renewal applications.
The fee depends on guest capacity, for example £310 for 1-2 guests, £620 for 3-4 and £930 for 5-6. The fee covers an initial application and the 3-yearly renewal. It is halved if you hold a current HMO licence.
Common mistakes
Only for new licence or renewal applications.
Display the council's public notice, protected from the weather, at or near the property so it can be read from the public footpath. Keep it up for 21 days from the date you lodge the application. Replace it quickly if removed or defaced.
Our guide: Short-term let site notice and certificate of compliance: how it works
When: 21 days from the date the application is lodged
The council’s own form for this (external site)
Only if the property has a private water supply.
If the property has a private water supply, comply with the Private Supplies Regulations 2017. Contact the council's pollution control team or the Drinking Water Quality Regulator for guidance.
Free reminders
Tell us when your licence expires and we’ll email you 90 days, 30 days and 7 days before, so there’s time to renew. It’s free and there’s no password.
Stay licensed (£39 per property, per year) emails you before your licence and each certificate run out, and helps you renew. Start with the free check to see exactly what Dundee will ask you for.