East Ayrshire Council
What East Ayrshire Council asks for when you renew, in plain English. Every point links to the council’s own pages. Information last checked 17 November 2026.
Apply to renew before your current licence expires. If you apply in time, the existing licence stays in effect until the council decides the renewal. The council does not state a recommended lead time. Renewal fees are lower than new licence fees. Floor plan is not needed if the layout has not changed. Tell the council about any changes since the licence was granted or last renewed.
Warning: Don't let it lapse
Letting without a licence is a criminal offence. Put your licence expiry date somewhere you’ll see it, and check above what East Ayrshire says happens if it runs out before you apply.
| For | Fee |
|---|---|
| Secondary letting · 1 to 4 guestsRenewal of a secondary let licence with a maximum occupancy of up to four. | £200 |
| Secondary letting · 5 or more guestsRenewal of a secondary let licence with a maximum occupancy of five or more. | £350 |
| Home sharing, Home letting, Home letting and sharing · 1 to 4 guestsRenewal for home sharing, home letting or both, with a maximum occupancy of up to four. | £75 |
| Home sharing, Home letting, Home letting and sharing · 5 or more guestsRenewal for home sharing, home letting or both, with a maximum occupancy of five or more. | £200 |
You pay this to East Ayrshire, not to us.
Certificates you sent with your first application may have expired since. East Ayrshire needs current ones with your renewal.
Upload an EICR on fixed electrical installations, produced by a competent person. An electrical inspection is needed at least every five years.
Our guide: EICR for a short-term let in Scotland: electrical safety explained
Who provides it: Competent person
If guests can use moveable electrical appliances, upload a PAT report. A competent person must also date, label and sign each tested appliance.
Our guide: PAT testing for short-term lets in Scotland
Who provides it: Competent person
Complete the fire safety checklist and email it with your application form to the council. Only complete it once you understand every question.
Our guide: Fire safety for short-term lets in Scotland: alarms, furniture and fire risk assessments
The council’s own form for this (external site)
Common mistakes
Carry out and record a fire safety risk assessment and include it with your application.
Our guide: Fire safety for short-term lets in Scotland: alarms, furniture and fire risk assessments
Complete a legionella risk assessment for the property and send a copy with your application.
Our guide: Legionella risk assessment for a short-term let in Scotland
Submit a floor plan of the areas covered by the licence. It is not needed for a renewal if the layout has not changed.
Our guide: Floor plans for a short-term let licence application in Scotland
Common mistakes
Provide a buildings insurance certificate that clearly covers short-term letting.
Our guide: Insurance for short-term lets in Scotland: buildings and public liability
Provide a public liability insurance certificate covering short-term letting. Keep it valid for every let.
Our guide: Insurance for short-term lets in Scotland: buildings and public liability
Provide planning permission, or the planning application reference, where in a control area or if the council asks. East Ayrshire currently has no control areas, but speak to planning first.
Our guide: Planning permission and short-term let control areas in Scotland
Only if the property has a gas supply.
If the property has a gas supply, upload the most recent gas safety certificate with your application. Arrange a gas safety inspection every year.
Our guide: Gas safety certificate for a short-term let in Scotland
Who provides it: Gas Safe registered engineer
Only if you don't own the property.
If you don't own the property, provide written proof of the owner's permission and their name and address. Joint owners must each consent.
Only for secondary letting.
For a dwellinghouse used for secondary letting, you need an EPC issued in the last 10 years. Give the rating and a copy with your application.
How recent: issued within the last 120 months when you apply
Only if there's a hot tub or spa pool for guests.
If you provide a hot tub, send a self-assessment form, a specific risk assessment and a written control scheme with your application.
The council’s own form for this (external site)
Only for new licence or renewal applications.
Complete the council's site notice template and display it at or near the property where the public can read it, protected from weather, for 21 days from the date you lodge the application. Replace it if removed or defaced.
When: 21 days starting on the date the application is lodged
Common mistakes
After the 21 days, complete the certificate of compliance and return it with the whole notice to licensing@east-ayrshire.gov.uk or by post.
When: At the end of the 21 day display period
Free reminders
Tell us when your licence expires and we’ll email you 90 days, 30 days and 7 days before, so there’s time to renew. It’s free and there’s no password.
Stay licensed (£39 per property, per year) emails you before your licence and each certificate run out, and helps you renew. Start with the free check to see exactly what East Ayrshire will ask you for.