
Moray Council
Everything Moray Council asks for when you apply for a short-term let licence, in plain English. Each item links to the council page it comes from.
Updated 17 November 2026Gathered from the council’s published information. Our team is still reviewing it.
What you need
0 documents for everyone
plus 12 depending on your situation, and 10 other steps.
See the documentsWhat it costs
New licence: £495
Paid to the council, not to us. Depends on your licence and guests.
See all feesSome documents depend on your property and situation. Our free check works out which apply to you.
Only if the property has a gas supply, for new licence or renewal or confirming a provisional licence applications.
If the property has a gas supply, upload the most recent Gas Safety Certificate with your application. Have a gas safety inspection done every year.
Our guide: Gas safety certificate for a short-term let in Scotland
Who provides it: Gas Safe registered engineer
How recent: issued within the last 12 months when you apply
Only for new licence or renewal or confirming a provisional licence applications.
If guests can use electrical fittings, upload the latest EICR for the fixed installations. A competent person must inspect at least every five years.
Our guide: EICR for a short-term let in Scotland: electrical safety explained
Who provides it: Competent person
Only for new licence or renewal or confirming a provisional licence applications.
If guests can use moveable electrical appliances, upload the latest PAT report. Inspected appliances must be dated, labelled and signed.
Our guide: PAT testing for short-term lets in Scotland
Who provides it: Competent person
Only for new licence or renewal or confirming a provisional licence applications.
Complete the Scottish Fire and Rescue Service fire safety checklist and send it with your application. You need a recorded fire safety risk assessment to answer it.
Our guide: Fire safety for short-term lets in Scotland: alarms, furniture and fire risk assessments
Who provides it: The dutyholder (host)
The council’s own form for this (external site)
Common mistakes
Only for new licence or renewal or confirming a provisional licence applications.
Complete a legionella risk assessment for the property and send a copy with your application. You can do it yourself if you are competent, using the council's template. Review it at least once a year.
Our guide: Legionella risk assessment for a short-term let in Scotland
Who provides it: Host if competent, otherwise someone competent
The council’s own form for this (external site)
Only for new licence or provisional licence (premises not ready yet) applications.
Send a detailed floor or layout plan of the premises. You can draw it yourself.
Our guide: Floor plans for a short-term let licence application in Scotland
Only for new licence or renewal or transfer to a new licence holder or confirming a provisional licence applications.
Send a valid buildings insurance certificate or other proof of cover, with insurer details and amount of cover. Keep cover in place for the whole licence.
Our guide: Insurance for short-term lets in Scotland: buildings and public liability
Only for new licence or renewal or transfer to a new licence holder or confirming a provisional licence applications.
Send a valid public liability insurance certificate for at least £5 million. Cover must be in place for every short-term let booking.
Our guide: Insurance for short-term lets in Scotland: buildings and public liability
Only if you don't own the property, for new licence or renewal or provisional licence (premises not ready yet) applications.
If you don't own the property or share ownership, give the name and address of each owner and a signed consent declaration from each owner (or someone authorised for them). The council has a style declaration you can use.
Who provides it: Each owner or person authorised to act for them
The council’s own form for this (external site)
Only for new licence or renewal or confirming a provisional licence applications.
If the property has an EPC issued in the last 10 years, send a copy and tick its rating on the form. Show the EPC rating on listings if one is required.
How recent: issued within the last 120 months when you apply
Only for new licence or renewal applications.
After 21 days, complete the Certificate of Compliance and return the whole notice to the council. You can send signed written confirmation with full applicant and property details instead. A time-stamped photo of the notice can help.
Our guide: Short-term let site notice and certificate of compliance: how it works
When: At the end of the 21-day display period
Who provides it: Applicant or agent
The council’s own form for this (external site)
Only for new licence or renewal or transfer to a new licence holder or provisional licence (premises not ready yet) applications.
If anyone named on the application was born in the UK and lived in another country for 12 months or more in the last 10 years, provide a criminal record check from each of those countries. If they were born outside the UK, provide one from their country of origin (if they lived there in the last 10 years) and from any other country they lived in for 6 months or more in the last 10 years. Checks must be under six months old, in English and verified by the UK Embassy or High Commission. Contact the council if you struggle to get one.
When: Can follow the application but is needed before grant
Who provides it: Relevant overseas authority
How recent: issued within the last 6 months when you apply
Common mistakes
Steps and declarations, grouped by when you’ll need to do them. Open each stage to see the list.
Only for new licence applications.
Check with the council's Planning Service whether you need planning permission or a certificate of lawfulness. If you do, apply for it before your licence application. The form asks for the reference and date granted.
Our guide: Planning permission and short-term let control areas in Scotland
When: Before submitting your licence application
Who provides it: Moray Council Planning Service
Common mistakes
Only if the property has a private water supply.
If you have a private water supply, check your duties under the 2017 Regulations and act before applying, for example by getting a satisfactory water sample. This takes time and costs extra.
When: Before you submit your application
Only for new licence or renewal applications.
When the council tells you your application is valid, display the public notice at or near the property where the public can easily read it. Keep it up for 21 days from the date the valid application was lodged.
Our guide: Short-term let site notice and certificate of compliance: how it works
When: Display for 21 days from the date a valid application was lodged
The council’s own form for this (external site)
Only for new licence or renewal or confirming a provisional licence applications.
Sign the declaration that you have met the mandatory licence conditions. Also sign that the details on the form are true. Giving false information is an offence.
Only for new licence or temporary licence applications.
Pay the full fee at the same time as submitting. The policy lists £495 for a licence and £495 for a temporary licence. The application won't be processed until the fee is paid. Fees are generally not refundable.
When: With the application
Common mistakes
Once licensed, keep in the premises, where guests can easily see it, a certified copy of the licence and conditions, fire, gas and electrical safety information, emergency contacts and copies of the safety reports.
Every listing or advert must show your licence number and an EPC rating if required. Listings must match your licence.
Have the gas safety check every year and the electrical inspection at least every five years. Keep fire furnishing records and keep evidence of compliance.
When: Gas annually; electrical at least every five years
Only for change to a licence (variation) applications.
Tell the council about significant changes to your circumstances or premises. Changes to the licence need a variation application, which has a fee.
Only for renewal applications.
Licences last three years. Apply to renew before expiry and complete a new site notice. If your licence lapses first, the application is treated as new.
When: Before the licence expires
Common mistakes
You pay these to the council, not to us. Fees are as published by the council; check the source before you pay.
| Who it applies to | Fee | Source |
|---|---|---|
| 3-year licenceFee for a new or existing operator applying for a short-term let licence of any type. The same fee applies whatever the number of guests. | £495 | moray.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| AllFee to change the terms of an existing short-term let licence. | £28 | moray.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| AllFee for a temporary short-term let licence, which can last up to six weeks. | £495 | moray.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| AllFee on the provisional licence application form checklist, for premises not yet built. Separate Planning Service fees also apply for the planning certificate. | £200 | moray.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| AllFee on the confirmation of provisional licence form. Separate fees are payable to Planning and Building Standards for their certificates. | £295 | moray.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| AllCharge for a copy of a short-term let licence, for example if yours is lost. | £22 | moray.gov.uk (external site) |
| AllCharge for an inspection of short-term let premises, which the applicant must pay when an inspection is needed. | £200 | moray.gov.uk (external site) |
Paying the fee: Pay online, by telephone or by cheque made payable to The Moray Council. The fee is £495 for a licence.
Paying the fee: Pay online, by telephone or by cheque made payable to The Moray Council.
Paying the fee: Cheque made payable to The Moray Council, or pay online or by telephone.
Moray Council Licensing Team, Council Offices, High Street, Elgin, IV30 1BX
Licence types covered: Secondary letting (a property that isn't your main home); Home letting (your own home while you're away); Home sharing (rooms in your home while you live there); Home letting and home sharing.
The council's sources do not say whether Moray has a short-term let control area. You must check with the council's Planning Service whether you need planning permission or a certificate of lawfulness before you apply for a licence. If you need planning permission and do not have it, the council will refuse to consider your licence application. Planning permission can take time and costs a separate fee.
The council’s planning information (external site)Our guide to control areas
Renew using the council's online renewal form, or the Word application documents by email or post. The council does not state how early to apply. If you apply to renew in time, your existing licence stays in effect until the council decides the renewal. The sources do not say what happens if a licence expires before you apply.
Renewing in Moray: fees, documents and how to apply
Free reminders
Tell us when your licence expires and we’ll email you 90 days, 30 days and 7 days before, so there’s time to renew. It’s free and there’s no password.
What the council says delays, returns or refuses applications.
Sending an incomplete application or not paying the fee. The council will not treat it as made at all until it is complete and paid.
Applying without planning permission when you need it. The council will refuse to consider the application and will not refund the fee.
Not answering every question on the form can lead to your application being returned.
Not sorting out a private water supply (for example a satisfactory water sample) before applying.
Not getting consent from all owners if you do not own the property or share ownership. Your application will be refused without it.
You can advertise but must not take bookings or receive guests until your licence is granted.
Moray will not grant temporary exemptions. This is to be reviewed on or before 1 October 2025.
Moray currently adds no extra licence conditions beyond the national mandatory ones. This could change and would be published.
Fees are generally not refundable, even if the application is refused. If you resubmit within 28 days of planning permission being granted, no further fee is charged.
You must display a public notice at or near the property for 21 days once the council says your application is valid. Then return the completed Certificate of Compliance. Anyone can object within 28 days. Temporary licences do not need the notice.
Children under 10 do not count towards maximum occupancy. Children aged 10 and over do count.
The council has 9 months to decide a valid application. It aims to be faster. Licences are normally granted or renewed for three years.
Fee conflict: the policy fee schedule lists £495 for a licence, but the provisional and confirmation forms show £200 and £295. The policy does not list provisional, confirmation or transfer fees, and the transfer fee is not stated in the sources. Check the current fee schedule with the council before paying.
A refused applicant cannot reapply within one year unless something material has changed.
Where this comes from
We built this page from the published information below. If anything differs, the council’s own version is the one that counts.
Moray short-term let licensing page(external site)Questions for the council: licensing@moray.gov.uk
Answer a few plain questions and we'll narrow this down to what applies to your property.