
Scottish Borders Council
Everything Scottish Borders Council asks for when you apply for a short-term let licence, in plain English. Each item links to the council page it comes from.
Updated 17 November 2026Gathered from the council’s published information. Our team is still reviewing it.
What you need
11 documents for everyone
plus 4 depending on your situation, and 10 other steps.
See the documentsWhat it costs
New licence: £417 to £537
Paid to the council, not to us. Depends on your licence and guests.
See all feesHow to apply
Online or by email or by post
You send the application to Scottish Borders yourself.
See the stepsSome documents depend on your property and situation. Our free check works out which apply to you.
Upload an Electrical Installation Condition Report from a competent person. Electrical inspections must happen at least every five years.
Our guide: EICR for a short-term let in Scotland: electrical safety explained
Who provides it: Competent person
Upload a PAT report for moveable appliances guests can use. The tester must date, label and sign each appliance checked.
Our guide: PAT testing for short-term lets in Scotland
Who provides it: Competent person
Complete a fire safety risk assessment before you start your application and provide a copy with it.
Our guide: Fire safety for short-term lets in Scotland: alarms, furniture and fire risk assessments
Complete the council's SFRS Fire Safety Checklist before applying. Answer every question accurately; do not submit it until you understand all the questions.
Our guide: Fire safety for short-term lets in Scotland: alarms, furniture and fire risk assessments
The council’s own form for this (external site)
Common mistakes
Complete a legionella risk assessment before applying, using the council template if you wish, and attach it. You can do it yourself if competent, and should review it at least yearly.
Our guide: Legionella risk assessment for a short-term let in Scotland
When: Review at least once a year
The council’s own form for this (external site)
Upload a floor plan, ideally at scale 1:50. For renewals with no layout change it is not needed.
Our guide: Floor plans for a short-term let licence application in Scotland
Upload a site plan of the property with your application.
Upload proof of valid buildings insurance covering the property for the whole licence.
Our guide: Insurance for short-term lets in Scotland: buildings and public liability
Upload proof of public liability insurance of at least £5 million, in place whenever the property is let.
Our guide: Insurance for short-term lets in Scotland: buildings and public liability
Where an EPC is required, upload it. It must be issued within the last 10 years and its rating must appear on your listings.
How recent: issued within the last 120 months when you apply
Where planning permission is needed, upload evidence of it, or of a planning application or certificate of lawful use. Check with the council's planning team first if unsure.
Our guide: Planning permission and short-term let control areas in Scotland
Only if the property has a gas supply.
If the property has a gas supply, upload a current gas safety certificate from a Gas Safe registered engineer. The inspection must be repeated every year.
Our guide: Gas safety certificate for a short-term let in Scotland
Who provides it: Gas Safe registered engineer
How recent: issued within the last 12 months when you apply
Only if the property has a private water supply.
If your water is not from Scottish Water, provide the most recent sample results for the supply.
Our guide: Private water supplies and short-term lets in Scotland
Only if you were letting the property before 1 October 2022.
If you were already letting before 1 October 2022, provide evidence such as adverts or booking payments.
Only if there's a hot tub or spa pool for guests.
If guests can use a hot tub or spa pool, lodge a risk assessment and written scheme of control with your application. Give 28 days' notice before first use of a new one. Inflatable hot tubs need prior written approval.
Our guide: Legionella risk assessment for a short-term let in Scotland
Steps and declarations, grouped by when you’ll need to do them. Open each stage to see the list.
Only if you don't own the property.
If you don't own the property, or share ownership, every owner must sign the council's consent form.
Who provides it: Property owner(s)
The council’s own form for this (external site)
Apply through a MyScotBorders account. You can save progress. Applications missing documents are not valid.
Common mistakes
Only for new licence or renewal applications.
Pay the fee for your guest capacity: £417 (1-3 guests), £465 (4-6) or £537 (7+) for three years. Fees are not refunded.
Only for new licence or renewal applications.
Display the council's site notice at or near the property for 21 days from the day you apply. Take a photo as proof, and redisplay for another 21 days if it is removed or defaced.
Our guide: Short-term let site notice and certificate of compliance: how it works
When: 21 days from the date the application is submitted
Common mistakes
Only for new licence or renewal applications.
After the 21 days, sign and send the Certificate of Compliance confirming you displayed the notice. Do not send it earlier.
Our guide: Short-term let site notice and certificate of compliance: how it works
When: After the 21 day display period ends
Common mistakes
Only if the property has a gas supply.
Have all gas pipes, flues and appliances checked every year. Do not let the property if an appliance fails until it is fixed.
When: Every year
Keep in the property, where guests can see it: the licence and conditions, safety information, emergency contacts, gas, electrical and PAT reports, and carbon monoxide alarm instructions.
Include your licence number, and EPC rating if one is required, on every advert. Adverts must match your licence.
Tell the council within 14 days of any change in your or the property's circumstances, and of any convictions or offences.
When: Within 14 days
Only for renewal applications.
Apply to renew before your licence expires, using your existing licence number for each property.
When: Before the licence expiry date
You pay these to the council, not to us. Fees are as published by the council; check the source before you pay.
| Who it applies to | Fee | Source |
|---|---|---|
| 1 to 3 guests · 3-year licenceNew or renewal licence fee for a property with 1 to 3 guests. Covers a 3-year licence. This is the council's current fee page. | £417 | scotborders.gov.uk (external site) |
| 4 to 6 guests · 3-year licenceNew licence fee for a property with 4 to 6 guests, for a 3-year licence. | £465 | scotborders.gov.uk (external site) |
| 7 or more guests · 3-year licenceNew licence fee for a property with 7 or more guests, for a 3-year licence. | £537 | scotborders.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| AllTemporary licence costs 50% of a full application. If you then apply for a full licence within the 6 weeks, the full fee is reduced by what you paid. | 50% of the full fee | scotborders.gov.uk (external site) |
| Who it applies to | Fee | Source |
|---|---|---|
| AllIf the council inspects after a complaint or a breach of conditions, it may charge its full cost based on the officer's hourly rate. | See details | scotborders.gov.uk (external site) |
Paying the fee: Pay the application fee as part of the online application.
Paying the fee: Debit or credit card over the phone (01835 826662) or cheque payable to Scottish Borders Council.
Paying the fee: Debit or credit card over the phone (01835 826662) or cheque payable to Scottish Borders Council.
Licensing Unit, Scottish Borders Council, Council Headquarters, Newtown St. Boswells, Melrose TD6 0SA
Licence types covered: Secondary letting (a property that isn't your main home); Home letting (your own home while you're away); Home sharing (rooms in your home while you live there); Home letting and home sharing.
The council has not designated any short-term let control areas and does not propose to, though this will be reviewed regularly. Outside a control area, the council as planning authority decides case by case whether a change of use needs planning permission. A licence does not replace planning permission or a certificate of lawful use if one is needed. The council advises hosts to talk to its planning department before applying. If a control area is introduced later, planning permission would be needed there.
Renew online through the same form used for new applications, using your existing licence number (one per property). Apply before your current licence expires. Late renewals can seriously affect your business. If you apply in time, your existing licence continues until the council decides on the renewal. The council has not given a recommended lead time.
Renewing in Scottish Borders: fees, documents and how to apply
Free reminders
Tell us when your licence expires and we’ll email you 90 days, 30 days and 7 days before, so there’s time to renew. It’s free and there’s no password.
What the council says delays, returns or refuses applications.
Missing documents make an application incomplete and invalid, so the council cannot consider it.
Returning the certificate of compliance before the 21-day notice period ends is not allowed.
The property address must match exactly on the form and all supporting documents.
Not disclosing convictions may lead to refusal.
Applying to renew after the licence expires has serious consequences for your business.
On top of the national mandatory conditions, Scottish Borders adds these.
Take reasonable steps to prevent and deal with noise or antisocial behaviour by guests, explain house rules, make sure guests park lawfully, and tell the council about incidents needing police.
Protect neighbours' privacy. Make sure guests understand rules for shared areas and close shared doors securely. Access codes or keys must not work after guests leave.
Give guests information and facilities for waste and recycling, tell them the bin collection day, label bins, and keep the bin area tidy.
Do not fix a key box to public or shared property without permission, and be able to show that permission to the council.
If guests can use a hot tub, you need a legionella risk assessment and written scheme of control with your application. Give 28 days' notice before first use. Inflatable hot tubs need prior written approval.
If guests can use a pool or swimming pond, you need a bather safety plan (and a pool safety operating plan for pools) lodged with your application, and 28 days' notice before first use.
If you provide a barbecue hut, fit a working carbon monoxide alarm, give guests safety instructions, and do not allow it as sleeping space or use by under-18s alone.
After a noise complaint investigation, the council may require floor coverings, no arrivals or departures between 11pm and 7am, or no amplified music outdoors after 11pm.
The council requires at least £5 million public liability insurance.
New hosts must have a licence before taking bookings or guests.
Fee conflict: the policy statement lists lower fees (for example £275 to £385 for a full licence) than the current fee page (£417 to £537). The fee page is used above as the more specific and current source.
Fees are not refundable, even if the licence is refused.
You must display a site notice for 21 days. Objections can be made for 28 days.
Tell the council of changes or convictions within 14 days.
The council does not plan to designate any planning control areas for now.
If refused, you cannot reapply within a year unless your circumstances materially change.
Where this comes from
We built this page from the published information below. If anything differs, the council’s own version is the one that counts.
Scottish Borders short-term let licensing page(external site)Questions for the council: stllicensing@scotborders.gov.uk · 01835 826662
Answer a few plain questions and we'll narrow this down to what applies to your property.